ENVIRONMENTAL DUE DILIGENCE REPORT, PHASE TANK CLOSURE ASSESSMENT, AND SITE ASSESSMENT

Environmental Engineering & Consulting

EE&G, Mana Wynwood, EE&G environmental, environmental engineers

As Prime Contractor, EE&G was retained by Mana Wynwood Miami to complete a required environmental due diligence assessment, tank removal assessment, and a site assessment in the area that is occupied by the Wynwood Thrifter Market. Such reports were prepared in accordance with the requirements set by the American Society of Testing and Materials (ASTM) Read More…

Phillips & Jordan Aboveground Storage Tank Closure Assessment Report (TCAR) – Port Richey, Florida

Environmental Engineering & Consulting

Port Richey, Port Richey Florida, Florida, Phillips & Jordan Aboveground, EE&G, eeg, environmental

EE&G I Phillips & Jordan Aboveground Storage (TCAR) I Port Richey, Florida. EE&G was contacted to assist in environmental matters regarding the “on-site” closure of a 9000 gallon petroleum and associated solids (tars), aboveground storage tank (AST). The AST was filled with liquid petroleum and petroleum solids (tar). The AST had to be opened and Read More…

Seville Hotel

Environmental Engineering & Consulting

Environmental Engineering & Consulting

EE&G was retained by The Ritz Carlton Hotel Company, LLC to conduct an initial Site Assessment, which was used to better design the expanded soil excavation event needed to address the source of the free-floating product (FFP) observed in a tank excavation area. Approximately 4,000-gallon steel UST was discovered at the eastern portion of the Read More…

Civic Center Brownfields Site City of Miami’s Brownfields Redevelopment Grant

Environmental Engineering & Consulting

Environmental Engineering & Consulting

A second primary focus of the grant focused on the City-owned Civic Center Property, which was impacted with dioxins and heavy metals (arsenic, barium and lead) associated with the historic dumping of incinerator fly-ash. EE&G conducted soil and groundwater assessment activities, prepared a Site Assessment Report, and conducted a Risk Assessment to assess the actual Read More…